一级淫片免费视频-一级淫片在线观看-一级在线 | 欧洲-一级在线观看视频-美女一级牲交毛片视频-美女伊人网

首頁 產品展示>Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成供應商,Perkins珀金斯850-854F柴油發動機T412827活塞總成技術價格規格咨詢服務,Perkins珀金斯850-854F柴油發動機T412827活塞總成零配件供應,Perkins珀金斯850-854F柴油發動機T412827活塞總成售后服務中心,Perkins珀金斯850-854F柴油發動機T412827活塞總成,Perkins珀金斯850-854F柴油發動機T412827活塞總成詳細的技術參數,
產品咨詢

詳細描述

項目   零配件號碼    最新件號   描述  

    1   T412827    4   T412827    活塞及圈總成        

    (1) T418484    4   T418484    活塞及圈總成 -O/S       

    7   T412812    4   T412812    連桿總成         

    10  T412845    4   T412845    大頭軸承總成        

    (10)   T412807    4   T412807    連桿瓦總成 -U/S         

    (10)   T412850    4   T412850    連桿瓦總成 -U/S            

Cylinder block top face

To inspect

Operation 7-2

Inspect the cylinder block top face for cracks, damage and distortion in the same way as for the cylinder head,

refer to Operation 3-19.

If outside limit, renew the cylinder block.

Distortion mm (in)

Standard

Service limit

Less than 0,05 (0.002)

0,12 (0.005)

Note:   For emissions approved engines. If a new cylinder block is fitted, the engine should be tested on an

engine test brake and the fuel adjustment screw set. This procedures is only done by a Perkins approved

dealer. This will ensure that the engine will conform with emissions legislation.

2

1

A

84

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

100 Series

8

Engine timing

8

Fuel injection pump timing

To check timing

Operation 8-1

Special requirements

Special tools

Description

Torque Nm (lbf ft) kgf m

Part number

Fuel pump spill pipe

21825680

Delivery valve holder

42 (31) 4,2

1  Set the piston for number 1 cylinder to TDC on the compression stroke. Turn the crankshaft counter-

clockwise a quarter of a revolution.

2  Disconnect or remove the ESOS, HP pipes and LP fuel inlet pipes from pump (A).

3  Ensure the throttle lever is held in the maximum fuel position after the procedure.

4  Remove the delivery valve holder for number 1 cylinder and remove the delivery valve. Store the delivery

valve in appropriate clean fuel until assembly.

Note:  The fuel pump may need to be moved to an upright position to remove and to fit the delivery valves.

Continued

Workshop Manual, TPD 1377E, issue 4

85

This document has been printed from SPI². Not for Resale


 

8

100 Series

5  Connect a suitable tank, which has a tap and contains 0,2 litres (¼ pint) of clean fuel, to the pump inlet.

6  Connect the fuel pump spill pipe to the delivery valve holder for number 1 cylinder. Put a suitable waste fuel

container below the pipe neck and open the tap, if correctly set fuel should flow (B).

Note:   The outlet from the tank should be approximately 152 mm (6 in) above the pump.

7  Turn the crankshaft slowly until the flow of fuel reduces to a drop which falls from pipe neck every 7-10

seconds. This is then the timing point.

8  Use the value shown by the timing mark (C1) with the injection timing tables given in "Injection timing" on

page 15.

1

Continued

86

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

8

100 Series

9  If engine timing is incorrect adjust the thickness of shim (D2) to correct.

Note:  If the shim thickness is adjusted by 0,1 mm, the timing will alter by approximately one degree. An

increase in the number of shims will retard the timing, but if the number of shims are decreased this will

advance the timing.

10  Fit the delivery valve.

Notes:

Ensure that the delivery valve holder (D1) is tightened to the specified torque.

For emissions approved engines. If it is necessary to change the fuel injection pump, the fuel delivery must

be reset on a suitable test dynamometer with the new pump. The procedure above, on injection pump

timing explains how to change the timing.

When changing the timing, it is important that this procedure is done before the engine is tested on a

suitable dynamometer.

2

1

Workshop Manual, TPD 1377E, issue 4

87

This document has been printed from SPI². Not for Resale

 

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 日本最好的免费影院 | 69pao强力打造免费高速 | 午夜精| 性视频亚洲 | 久久综合欧美 | 欧美性色黄在线视 | aa视频在线 | 天天干在线播放 | 轻点太大了好深好爽h文 | 欧美zooz人禽交免费 | 国产精品久久国产三级国不卡顿 | 女性私密部位扒开的视频 | 婷婷婷色 | 美女写真福利视频 | 免费国产成高清人在线视频 | h版欧美一区二区三区四区 h网站亚洲 | 国产成人精品午夜二三区 | 毛片免 | 亚洲综合在线最大成人 | 国产精品亚洲玖玖玖在线靠爱 | 兔费看全黄三级 | 67pao强力打造高清免费 | 国产精品你懂的 | 在线免费看一级片 | 狠狠色狠狠色综合日日32 | 色妞综合网| 婷婷综合五月中文字幕欧美 | 午夜精品久久久久久久2023 | 激情午夜婷婷 | 视频免费播放 | 色香影视| 婷婷五月天.com | 黄色大全片 | 天天干天天色天天干 | 亚洲网站大全 | 黄色超污网站 | 午夜视频在线观看免费视频 | 欧美成人性色xxxxx视频大 | 天天综合色一区二区三区 | 35qao强力打造免费上线高清 | 美国人与性xxxxxxx |